Florida Keys Aqueduct Authority Water Transmission
System Subaqueous Pipeline


Project Dates: 02/03/2021 – 09/22/2021
UESI Project Director: Andrew Connelly
UESI Project Manager: Randal Bazemore
UESI Project Number: COM2021204


The work for this project consisted of furnishing all labor, materials, equipment, and all incidentals for the installation of the improvements to the existing revetment along the 36-inch subaqueous potable water transmission main at six (6) specified culvert crossing locations, and for the installation of subaqueous crossing warning signs at eighteen (18) bridge or culvert crossing locations.