FPL U3 Circ Water Pipe Dewater and Inspection


Project Dates: 11/10/2020 - 12/16/2020
UESI Project Director: Andrew Connelly
UESI Project Manager: Alex Kraeger
UESI Project Number: COM2020314.00


UESI performed an inspection of the FPL Martin Plant Unit 3 Circulating Water Discharge Pipe. The pipe is a 2500-LF concrete pipe. The associated work consisted of the following: install stop logs and dewater the discharge vault; remove levee manhole and dewater main section to remove lower manholes; remove lower manholes to finish dewatering, install ventilation and open main access; install pump and dewater the backside of the levee circ water discharge; inspect the circ water pipe and discharge vault for spalls, cracks, exposed rebar, joint filler condition, and the general condition of the concrete pipe; reinstall the manhole covers; and provide a report describing and documenting found conditions.
parallax background
FPL U3 Circ Water Pipe Dewater and Inspection
FPL U3 Circ Water Pipe Dewater and Inspection
FPL U3 Circ Water Pipe Dewater and Inspection