Project Dates: 05/01/2019 - 08/02/2019
UESI Project Director: Andrew Connelly
UESI Project Manager: Randal Bazemore
UESI Project Number: COM2019248.00


UESI was contracted for the demolition and disposal of the existing Wabasso Causeway Fishing Pier, approach sidewalks and associated debris. The pier was severely damaged during Hurricane Matthew in 2016, with eight sections being displaced and laying at the river bottom. The entire pier and support structure, which is approximately 1,000 feet long was removed and placed at a permitted offshore artificial reef site.