City of Cocoa Beach Dune Walkover Replacement


Project Dates: 01/27/2021 – 02/10/2021
UESI Project Director: Andrew Connelly
UESI Project Manager: Lee Busbin
UESI Project Number: COM2021216.00



UESI performed the setting of a total of seventy-seven (77) six inch in diameter, pressure treated pilings and approximately four hundred (400) feet of two inches, three strand nylon rope rails installations at two (2) dune walkovers located at Shepard Park.